Back to Calslaan 9!
The students of Calslaan 9 are back in their residence! Last Friday, with temperatures below freezing, was moving day. A few students even picked up a brush and some paint to give the walls a fresh new look. After all…

The students of Calslaan 9 are back in their residence! Last Friday, with temperatures below freezing, was moving day. A few students even picked up a brush and some paint to give the walls a fresh new look. After all…

With a white blanket of snow and renewed energy, we’re back at work! After the holidays, the construction site at Calslaan 9 has come back to life, and the team is busy putting the final finishing touches in place. Despite…

The finish line is in sight at Calslaan 9! The new bathrooms are nearly finished — the ceilings are being installed this week. Outside, the scaffolding is coming down and the crane has already moved on to the next building.…

Winter is setting in, and it shows: it has become much colder and wetter. But that doesn’t stop our craftsmen. They are hard at work upgrading the exterior façade. The façade is being thoroughly cleaned and the window frames are…