Building progress at Calslaan 11

It will take a little over a month before the students of Calslaan 11 can move back in. In the meantime, work is in full swing! Newly insulated walls are being installed in the student rooms, installations are being added, and the central corridors are getting a fresh coat of paint. Step by step, the building is really taking shape — and everything is right on schedule.